Kurmond

In August 2026, Ground Earthworks completed a swale drain improvement project in Kurmond to assist with water flow from the bore into the dam. Using our 3.5-tonne excavator and truck, we cleaned out the existing swale drain before supplying and installing 14 C-grade sandstone blocks. We also supplied and placed 13 tonnes of 53mm minus sandstone to line the drain, helping to manage water flow and reduce erosion. The result is a well-prepared drainage channel designed to improve water management across the property.