Northbridge Site Prep & Installation

Northbridge

In December 2025, Ground Earthworks completed a turf preparation and installation project in Northbridge covering an area of approximately 180 square metres. The nature strip was excavated and stripped back by around 100mm, with all existing material and soil removed from site. Premium Evergreen turf underlay soil was then imported, levelled, and prepared before laying Sir Walter Buffalo turf. An excavator and dumper were used to complete the works efficiently, with both an 8m³ and 10m³ skip bin supplied and filled to ensure all waste material was properly disposed of, leaving the area clean and professionally finished.

Northbridge Site Prep & Installation