top of page
Site Preparation
Warnervale
In August 2026, Ground Earthworks completed a site preparation project in Warnervale, reshaping and levelling the front yard in preparation for new landscaping. Using our 1-tonne excavator and dumper, we removed the existing weeds and approximately 5 cubic metres of material before preparing a garden bed along the footpath and levelling the area beside the house for a future concrete path. The front yard was then carefully graded so the different areas tied together through the centre, leaving the site ready for the installation of new turf, garden beds and concrete.

bottom of page












